2026 Tubbs Island Levee Rehab Phase 1B
PROJECT DESCRIPTION: Levee scarification and compacted fill with imported material. Refurbishment of a new levee access road on the crown of levee across approximately 1,200 LF of levee alignment. Improvements to access road and levee turnaround improvements, and installation of a new levee ramp. Repair six erosion sites totaling 735 LF that will include removal of existing rock, slope repair, and placing rock back.
| Filetype Icon | Name | Size |
|---|---|---|
| 3.2 MB |
