Skip to main content

2026 Tubbs Island Levee Rehab Phase 1B

PROJECT DESCRIPTION: Levee scarification and compacted fill with imported material. Refurbishment of a new levee access road on the crown of levee across approximately 1,200 LF of levee alignment. Improvements to access road and levee turnaround improvements, and installation of a new levee ramp. Repair six erosion sites totaling 735 LF that will include removal of existing rock, slope repair, and placing rock back.
Filetype Icon Name Size Quick Download
208.7 KB Download