2026 Tubbs Island Levee Rehab Phase 1B
PROJECT DESCRIPTION: Levee scarification and compacted fill with imported material. Refurbishment of a new levee access road on the crown of levee across approximately 1,200 LF of levee alignment. Improvements to access road and levee turnaround improvements, and installation of a new levee ramp. Repair six erosion sites totaling 735 LF that will include removal of existing rock, slope repair, and placing rock back.
Status
Bidding Closed
| Prebid Date | 6/24/26 10:30am |
| Bid Date | 7/7/26 2:00pm |
Location
Vallejo, CA
PUBLIC OPENING
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/296349039772742?p=ObwXUFHOMl2Uut7Xzi
Meeting ID: 296 349 039 772 742
Passcode: xz9fS9AK
Dial in by phone
Phone conference ID: 715 521 180#
CONSTRUCTION COST ESTIMATE: $754,000
A Mandatory pre-bid site visit will be held at Tubbs Island on June 24, 2026 at 10:30 am. The meeting location is south of the intersection of State Route 37 and Noble Road, just inside the gate.
Please RSVP to Natalie at nmuradian@vallejowastewater.org.
License Required: A or C-12
