MIPS 3W Effluent Bypass Project
Base bid includes construction of a new pile-supported Chlorine Contact Tank D; construction of a new pile-supported Mare Island Strait Outfall Pump Station; modifications to existing Chlorine Contact Tank C; construction of outfall piping; and general site improvements. Bid Alternate 1 includes the removal of the existing South biotower cover, the removal of existing media, replacement of new media, and replacement of rotary distributor, drive, and VFD. See additional information on basebid and bid alternates in Section 01 11 00, Summary of Work.
Addendum 1
(click to expand/collapse)
Name | Size | |||
MIPS_POF016_Addendum 1_Final | 2.5 MB |
Addendum 2
(click to expand/collapse)
Name | Size | |||
POF016_Addendum 2 | 246.4 KB |
Addendum 3
(click to expand/collapse)
Name | Size | |||
POF016_Addendum 3_signed | 1.6 MB |
Addendum 4
(click to expand/collapse)
Name | Size | |||
POF016_Addendum 4_signed | 4.6 MB |
Addendum 5
(click to expand/collapse)
Name | Size | |||
POF016_Addendum 5_compile_sign | 12.2 MB |