WWTP Solids Facility Conduit & Wire Project -PSH009
Project Description: Replacement of corroded electrical conduits, conductors, and enclosures with corrosion resistant materials throughout the Dewatering Building.
Bid Documents
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 02_23-12-18 PSH009_Specifications | 6.4 MB | ||
| 03_23-12-18_PSH009_PART A | 1.8 MB | ||
| 04_23-12-18_PSH009 PART B | 1.0 MB |
