Fulton Storm Drain Improvement Project CDD007
Construction of one curb opening inlet with a curb opening, troughs and a grate, 46 feet of curb gutter and sidewalk, including surface restoration of public streets and rights of way, and all other work required to complete project.
Specifications
(click to expand/collapse)

Name | Size | ||
Bid Specifications_Fulton Ave Storm Drain (003) | 8.4 MB |