Stormwater Trash Capture Project CDD001
Construction of seven (7) large trash capture netting devices within new and existing concrete structures at three (3) locations.
Addendum 1
(click to expand/collapse)
Name | Size | |||
CDD001_Rebid Addendum 1 | 369.0 KB |