Tubbs Island Levee Rehabilitation Phase 1 (PSH001)
PROJECT DESCRIPTION: Levee scarification and compacted fill with imported material. Refurbishment of a new levee access road on the crown of levee across approximately 7,600 LF of levee alignment.
Status
Accepting Bids
Prebid Date | 8/14/25 10:00am |
Bid Date | 8/28/25 2:00pm |
Location
Vallejo, CA
CONSTRUCTION COST ESTIMATE: $500,000
A non-mandatory pre-bid site visit will be held at Tubbs Island on August 14, 2025 at 10:00 am. The meeting location is south of the intersection of State Route 37 and Noble Road, just inside the gate.
Please RSVP to Natalie at nmuradian@vallejowastewater.org.
License Required: A